Skip to content

AMC

AI Assistant
nwd - Announcement ...
 
Notifications
Clear all

nwd - Announcement Regarding the Relocation of Rig 11 from Current Location E1-96 to New Location D1-96

1 Posts
1 Users
0 Reactions
38 Views
Member Admin
Joined: 10 months ago
Posts: 91
Topic starter
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
  [#34]

Announcement Regarding the Relocation of Rig 11 from Current Location E1-96 to New Location D1-96

The Public Services Department of the National Drilling and Well Maintenance Company announces a request to relocate Rig 11 from its current location E1-96 to its new location D1-96. The following equipment is required:

Two 60-ton hydraulic cranes at the new location, meeting all specifications and certifications.

One 60-ton hydraulic crane at the old location, meeting all specifications and certifications.

One 8-10 ton forklift at the new location, meeting all specifications and certifications.

Twenty-five 50-ton off-road trucks with brushes.

Four 1.5-inch cables for each crane, meeting all specifications and certifications.

Two low-level cranes for inter-location work as required.

All equipment is provided as requested and must be submitted according to the timesheet approved by the Rigmaster.

Equipment Requirements:

Driver's License.

Oil Work Permit.

Vehicle Registration.

Insurance. All hydraulic lifts, forklifts, and cables must have a valid third-party certification.

A convoy supervisor must be provided to facilitate transportation and installation; work will not commence without one.

Fuel (diesel) is the responsibility of the transport company.

Please note that the number of loads is ±85, including ±20 occasional loads. The above requirements must be met within one week from Thursday, December 11, 2025.

The distance between the old site and the new site (One Balloul), belonging to the Algerian Sonatrach company, is ≥65 km.

The deadline for submitting bids is Thursday, December 11, 2025, at the office of the Director of the General Services Department.

إعلان عن تحريك الحفارة 11 من الموقع الحالي E1-96 إلى الموقع الجديد D1-96 – الشركة الوطنية لحفر وصيانة آبار النفط

 
 

 

 


This topic was modified 7 months ago by The boss

   
Quote
Share: